Ongoing
Victory For The People Of Govindarajanagara

Hon’ble Chief Minister Shri. Siddaramaiah lays the foundation stone for over Rs. 400 crore worth developmental programs and initiatives in Govindarajanagara.

View more details

Start Date
07-01-2016
End Date
22-08-2018
Ongoing
Strengthening Storm Water Drains

The good health and sanitation facilities for every citizen is of paramount importance. Waterlogging and flash floods are resultant of bad drainage and can lead to multiple hazards. We are constructing and upgrading existing storm water drains with robust walls and hard shoulders in our constituencies. For the wellbeing of the people of Vijayanagara.

View more details

Start Date
04-02-2016
End Date
22-08-2018
Completed
Asphalting and Improvements of Roads

Asphalting and improvements to Byatarayanapura police station to Muneswara block main road in W.N 157

View more details

Start Date
09-02-2016
End Date
14-06-2017
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 108

View more details

Start Date
10-02-2016
End Date
07-12-2016
Ongoing
Social Security For Everyone

Every citizen, we believe, deserves social security. Social security is the foundation of the progress of people.To ensure equal social stability for the people of Vijayanagara. we are providing holistic support through financial assistance in the form of BPL cards to self help groups, assured healthcare through Health Cards, monthly pensions for all elderly citizens, implementing Anna Bhagya, Ksheera Bhagya, Bhagyalaxmi. We are also creating new and lucrative job opportunities and ease access to technology for everyone, everywhere.

View more details

Start Date
10-02-2016
End Date
18-07-2018
Ongoing
SAFETY FIRST

The safety of each and every denizen of  Govindarajanagara is our first and foremost priority. To ensure safety for all through round the clock vigilance, we are installing over 600 CCTV
cameras . We are also deploying a people friendly police force to safeguard the interest of the people,and installing trac signals at strategic intersections for ease of movement.

View more details

Start Date
10-02-2016
End Date
22-11-2018
Ongoing
Building Modern Vijayanagar

We envision to bring progress through development and have dedicated our eorts to build a modern Vijayanagara. For the people, the youth, the families,every single resident. To achieve this, we have put on ground projects worth Rs 80 cr. Which include construction of the underground Palika Bazaar, upgradation of the Hampi Nagar Swimming Pool,revamping of the
Ambedkar Stadium and BGS ground,construction of new commercial complexes and a new railway station.

View more details

Start Date
11-02-2016
End Date
13-06-2018
Ongoing
The Heritage of the Vijayanagara Kingdom

We are invoking our golden heritage, by bringing alive the glory and architectural splendor of the ancient Vijayanagara Kingdom. We have initiated project Vijayanagara Vaibhava worth Rs 65 cr. which include construction, landscaping,decorative lighting and adornment of 25 model boulevards, along Vijayanagara. Our tribute to the victory of the people.
And the people have just started winning!

View more details

Start Date
11-02-2016
End Date
08-03-2018
Ongoing
The Heritage of the Govindarajanagar Kingdom

We are invoking our golden heritage, by bringing alive the glory and architectural splendor of the ancient Vijayanagara Kingdom. We have initiated project Vijayanagara Vaibhava worth Rs 65 cr. which include construction, landscaping,decorative lighting and adornment of 25 model boulevards, along Govindarajanagara. Our tribute to the victory of the people. And the people have just started winning!

View more details

Start Date
17-02-2016
End Date
15-08-2018
Ongoing
Social Security For Everyone

Every citizen, we believe, deserves social security. Social security is the foundation of the progress of people.To ensure equal social stability for the people of Govindarajanagara, we are providing holistic support through financial assistance in the form of BPL cards to self help groups, assured healthcare through Health Cards, monthly pensions for all elderly citizens, implementing Anna Bhagya, Ksheera Bhagya,Bhagyalaxmi. We are also creating new and lucrative job opportunities and ease access to technology for everyone, everywhere

View more details

Start Date
23-02-2016
End Date
24-08-2018
Ongoing
Victory For The People Of Vijayanagara

Hon’ble Chief Minister Shri. Siddaramaiah lays the foundation stone for over Rs. 400 crore worth developmental programs and initiatives in Vijayanagara.

View more details

Start Date
03-03-2016
End Date
22-06-2018
Completed
Maintenance of Park in ward 128

Maintenance o Vidhyagiri Layout Park Part-1 and 2 Maintenance of Arundathi Nagar park Part 1 and 2

View more details

Start Date
08-03-2016
End Date
13-06-2017
Completed
Construction of individual houses

Construction of individual houses to Economically weaker section benifieciers in flood damaged area in ward no 131

View more details

Start Date
08-03-2016
End Date
13-12-2016
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 107

View more details

Start Date
08-03-2016
End Date
03-11-2016
Ongoing
Privileges for the Needy

BPL Card, Health Card, Self Employment Opportunities.

View more details

Start Date
17-03-2016
End Date
14-06-2018
Ongoing
Strengthening Storm Water Drains

The good health and sanitation facilities for every citizen is of paramount importance. Waterlogging and flash floods are resultant of bad drainage and can lead to multiple hazards. We are constructing and upgrading existing storm water drains with robust walls and hard shoulders in our constituencies. For the wellbeing of the people of Govindarajanagara.

View more details

Start Date
22-03-2016
End Date
14-08-2018
Completed
Improvements to drain and providing covering slab

Improvements to drain and providing covering slab at Muneshwara nagara main and cross roads(Balance portion) in ward no. 103

View more details

Start Date
05-04-2016
End Date
14-12-2016
Completed
Drilling of Borewells in Gali Anjaneja Swamy ward

Drilling of borewell with pipeline of various places of in kasuturabanagara in gali anjaneya swamy ward 157

View more details

Start Date
02-05-2016
End Date
05-01-2017
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 110

View more details

Start Date
03-05-2016
End Date
07-02-2017
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 109

View more details

Start Date
04-05-2016
End Date
07-12-2016
Ongoing
Benefits For The Underprivileged

In the constituencies of Vijayanagara, every citizen has a right to socio-economic privileges. Leveraging the Ambedkar Development Board,
Valmiki Development Board, Minority Development Board and Devaraja Urs Development Board, we are implementing multiple projects, to ensure equal privileges for all
communities, including irrespective of religion, caste or creed. Our nitiatives have resulted in education opportunities, better homes,social-economic benefitsand comprehensive growth
for the people.

View more details

Start Date
11-05-2016
End Date
10-07-2018
Ongoing
Building Modern Govindarajanagara

We envision to bring progress through development and have dedicated our eorts to build a modern Govindrajanagara. For the people, the youth, the families,every single resident. To
achieve this, we have put on ground projects worth Rs 80 cr. Which include construction of the underground Palika Bazaar, revamping of the Ambedkar Stadium and BGS ground,
construction of new commercial complexes and a new railway station.

View more details

Start Date
11-05-2016
End Date
16-05-2018
Ongoing
Rs.150 Crore Investment In Infrastructure

We are on a mission to bring comprehensive progress for the people through development of infrastructure in Vijayanagara. To achieve this, stronger urban infrastructure including safer roads and eective drainage systems are being built and existing infrastructure is being upgraded across these two constituencies. Infrastructure development projects worth over Rs 150 crore include upgrading main roads, cross roads, trac intersections and open and closed drains. Other initiatives include ensuring adequate water
supply for all residents, and facilitating need based water supply units to ensure water for everyone, everywhere.

View more details

Start Date
18-05-2016
End Date
22-05-2018
Ongoing
Homes for Needy

Distribution of Sale Deeds and Ownership Rights Everyone has the right to a good home. Good homes foster happy families. We are building homes for the underprivileged in the constituencies of Govindarajanagara and providing support to the needy to build houses. For many decades, citizens were waiting for property rights. Consequent to our eorts, the dream
of the needy for a home has come true. Every deserving denizen across all sections of our society has a home today.

View more details

Start Date
25-05-2016
End Date
18-10-2018
Ongoing
Recreating the architectural splendor of the Vijayanagara kingdom


Developing 25 Model Boulevards.

View more details

Start Date
26-05-2016
End Date
22-08-2018
Ongoing
Facilities For All

We are committed to create facilities that add convenience and comfort to the lives of every citizen of Govindarajanagara. To ensure this, we have undertaken multiple projects which
include White Topping from Magadi Road Toll gate to Mysore Road on Chord Road,and from Magadi Road Leprosy Hospital to Sumanahalli junction. We are also building a Railway
Underpass near Umiya Bhawan for ease of movement of trac and commuters. 15 Indira Canteens have been launched across these two constituencies, feeding thousands everyday. We are
providing pure drinking water for every citizen through RO plants. We are also empowering young students by providing computers and Wifi facilities in every Government School in our constituencies.

View more details

Start Date
17-06-2016
End Date
14-08-2018
Ongoing
Building Modern Vijayanagara

Palika Bazar, Swimming Pool, Underpass, Stadium, Commercial Complex

View more details

Start Date
14-07-2016
End Date
06-06-2018
Ongoing
Privileges for the Needy

BPL Card, Health Card, Self Employment Opportunities.

View more details

Start Date
15-07-2016
End Date
28-08-2018
Ongoing
Rs.150 Crore Investment In Infrastructure

We are on a mission to bring comprehensive progress for the people through development of infrastructure in Govindarajanagara. To achieve this, stronger urban infrastructure including safer roads and eective drainage systems are being built and existing infrastructure is being upgraded across these two constituencies. Infrastructure development projects worth
over Rs 150 crore include upgrading main roads, cross roads, trac intersections and open and closed drains. Other initiatives include ensuring adequate water
supply for all residents, and facilitating need based water supply units to ensure water for everyone, everywhere.

View more details

Start Date
21-07-2016
End Date
16-08-2018
Completed
Improvements to drain and Providing covering slabs

Improvements to CC road from ranganathapura ganesha temple to RES school Kaveripura in Ward No 103

View more details

Start Date
11-08-2016
End Date
11-08-2016
Completed
Improvments to the Street Lighting

Improvments to the Street Lighting at Mysore Road B/W Sirsi Circle and Vijayanagara Chord Road Junction in Ward No. 134

View more details

Start Date
11-08-2016
End Date
11-08-2016
Completed
Construction of individual houses for SC/ST

Construction of houses benefeciers in ward no-131 (25 Nos houses) for backward classes

View more details

Start Date
16-08-2016
End Date
23-11-2017
Completed
Filling of Poth holes

Filling of Poth holes in ward No 134 and around vijaynagar

View more details

Start Date
07-09-2016
End Date
31-03-2017
Completed
Developmental works for Providing drinking water

Developmental works for Providing drinking water facility in kaveripura in W no 103

View more details

Start Date
10-09-2016
End Date
10-09-2016
Completed
Providing Control Wires to the Street lights

Providing Control Wires to the Street lights in Hanumanthappa Industrial Area and Patel Puttaiah Area in ward no. 41

View more details

Start Date
10-09-2016
End Date
10-09-2016
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain in 1st main road, Manjunathnagar in Ward No.134.

View more details

Start Date
10-09-2016
End Date
10-09-2016
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 3rd Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
10-09-2016
End Date
10-09-2016
Completed
Improvements to drain and Providing covering slabs

Improvements to drain and Providing slab for Kaveripura cross road in Ward No 103

View more details

Start Date
15-09-2016
End Date
15-09-2016
Completed
Maintenance of Health Centre Building

Maintenance of Health Centre Building at Bapujinagar w-134

View more details

Start Date
15-09-2016
End Date
15-09-2016
Completed
Drilling of Commissiong 4 nos borewell

Drilling of borewell and providing mini water supply and pipeline (5 nos)in Ward No 106

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Improvements to footpath and Reconstruction of drain

Improvements to footpath and Reconstruction of drain at 8th cross(w/s) of MRCR layout in Ward No 104

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Drilling Of Borewells With Pipeline

Drilling Of Borewells With Pipeline At Various Places In Bapujinagara In Ward No.134.

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Asphalting to Bad roads

Asphalting to Bad roads at Ranganathapura & HV.R Layout

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Providing and Fixing Additional GI Pipes

Providing and Fixing Additional GI Pipes And Pannel Board in Varthur Ward No. 134

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Operation and Maints of Street Light

Operation and Maints of Street Light in Ward No 134 Gunjur

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 4th Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
20-09-2016
End Date
20-09-2016
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 5th Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
20-09-2016
End Date
20-09-2016
Ongoing
Benefits For The Underprivileged

In the constituencies of Govindarajanagara, every citizen has a right to socio-economic privileges.Leveraging the Ambedkar Development Board,Valmiki Development Board, Minority
Development Board and Devaraja Urs Development Board, we are implementing multiple projects, to ensure equal privileges for all communities, including irrespective of religion,
caste or creed. Our nitiatives have resulted in education opportunities, better homes, social-economic benefits and comprehensive growth for the people.

View more details

Start Date
21-09-2016
End Date
29-05-2018
Completed
Pot hole filling in ward juridiction

Pot hole filling in W No 126

View more details

Start Date
25-09-2016
End Date
25-09-2016
Completed
Sinking of 165 MM Dia Borewell

Sinking of 165 MM Dia Borewell at Varthur and Sorahunse in Varthur Ward 134 in Whitefield Sub-Div

View more details

Start Date
25-09-2016
End Date
25-09-2016
Completed
Pot hole filling in ward juridiction

Cement Concrete to damaged road in gangondanahalli area in W No 131

View more details

Start Date
25-10-2016
End Date
25-10-2016
Completed
Sinking of borewell and providing mini water

Sinking of borewell and providing mini water

View more details

Start Date
25-10-2016
End Date
25-10-2016
Completed
Const Repairs and Maintenance

Const Repairs and Maintenance of Toilet Under Community Dev at Panathur Dinne

View more details

Start Date
25-10-2016
End Date
25-10-2016
Completed
Construction of drain and asphalting to bad roads

Construction of RCC box drain and asphalting to bad roads at 1st main road kuvempunagar in ward No.134

View more details

Start Date
25-10-2016
End Date
25-10-2016
Completed
Repair of Street lights/Park Lightings

Providing 250 Watts SV Fittings/Poles/Control Wires/Park Lightings/Switches Etc,. in Ward No.106

View more details

Start Date
11-11-2016
End Date
05-06-2017
Completed
Upgradation of Street Lights

Upgradation of Street Lights at Agrahara Dasarahalli in ward no 105

View more details

Start Date
16-11-2016
End Date
16-11-2016
Completed
Providing Pothole filling

Providing Pothole filling and Depo collection for the Year 2016-17

View more details

Start Date
16-11-2016
End Date
16-11-2016
Completed
Drilling of Borewells

Drilling of Borewells at Hosahalli Referral Hospital in ward no 105

View more details

Start Date
20-11-2016
End Date
20-11-2016
Completed
Filling of pot holes

Filling of pot holes in Jurisdiction ward No.157

View more details

Start Date
20-11-2016
End Date
20-11-2016
Ongoing
Building Modern Govindarajanagara

We envision to bring progress through development and have dedicated our eorts to build a modern Vijayanagara. For the people, the youth, the families,every single resident. To achieve this, we have put on ground projects worth Rs 80 cr. Which include construction of the underground Palika Bazaar, upgradation of the Hampi Nagar Swimming Pool,revamping of the
Ambedkar Stadium and BGS ground,construction of new commercial complexes and a new railway station.

View more details

Start Date
23-11-2016
End Date
06-06-2018
Ongoing
Facilities For All

We are committed to create facilities that add convenience and comfort to the lives of every citizen of Vijayanagara. To ensure this, we have undertaken multiple projects which include White Topping from Magadi Road Toll gate to Mysore Road on Chord Road, and from Magadi Road Leprosy Hospital to Sumanahalli junction. We are also building a Railway Underpass near Umiya Bhawan for ease of movement of trac and commuters. 15 Indira Canteens have been launched across these two constituencies, feeding thousands everyday. We are providing pure drinking water for every citizen through RO plants.We are also empowering young students by providing computers and Wifi facilities in every Government School
in our constituencies.

View more details

Start Date
23-11-2016
End Date
24-05-2018
Completed
Construction of additional class room

Construction of additional class room in second floor in school building at Byraveshwara nagara in W no 127

View more details

Start Date
20-12-2016
End Date
20-12-2016
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 2nd Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
20-12-2016
End Date
20-12-2016
Completed
Maintainence of Park

Providing and fixing Ornamental grill and other development works at Basava Vana Park in ward no 105

View more details

Start Date
27-12-2016
End Date
27-12-2016
Completed
Improvements to Drain and covering slab

Improvements to Drain and covering slab to 9th cross road of KHB Colony in ward no. 105

View more details

Start Date
27-12-2016
End Date
27-12-2016
Completed
Asphalting of bad roads

Asph to 3rd 4th 6th to 10th Cross in B.pura New Extension and 1st 5th cross in Raghavanagar 1st to 4th Cross in Vinobha Colony in cross road ganapathi nagar

View more details

Start Date
27-12-2016
End Date
27-12-2016
Completed
Providing Electrification

Providing Electrification to SC/ST Houses Under Bhagyajyothi Scheme in Gali Anjaneya Swamy Temple in Ward No. 157

View more details

Start Date
27-12-2016
End Date
27-12-2016
Completed
Construction work

Construction of Anganavadi Kendra/Community Hall/Development works/ School Building etc

View more details

Start Date
10-01-2017
End Date
10-01-2017
Completed
Repairs to Byatarayanapura Main Road

Repairs to Byatarayanapura Main Road and cross roads Footpath

View more details

Start Date
10-01-2017
End Date
10-01-2017
Completed
Construction of individual houses

Construction of individual houses (30 nos) for SC/ST bneficiars at B.R.I. Colony.

View more details

Start Date
12-01-2017
End Date
12-01-2017
Completed
Improvements of footpath

Regarding of Drains Couning slab & Improvements of footpath in Mysore Road in ward No.157

View more details

Start Date
12-01-2017
End Date
12-01-2017
Completed
Construction of individual house

Construction of individual house for OBC beneficiaries in W No 131

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Construction of individual houses for SC/ST

Construction of individual house for economically weaker section beneficires in Flood damaged area in W No 131

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Construction of individual houses for SC/ST

Construction of individual house to EWS in W No 128

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Construction of Day care center

Construction of Day care center at 12th cross M C Layout in Ward No 104

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Providing New Street Light

Providing New Street Light In the Ward Jurisdiction (Provision for New Street Lights) In Ward No. 134

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Construction of individual houses

Construction of individual houses for SC/ST families under soru Yojane @ bapujinagar & maruthinagar in ward No.134

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Reconstruction of Drains

Reconstruction of Drains in the ward jurisdiction in ward

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Development of Roads and Drains

Development of Roads and Drains Near Vartur Sharada Vidya Mandir W.N 134

View more details

Start Date
20-01-2017
End Date
20-01-2017
Completed
Pot holes Filling

Pot holes Filling in ward limits of Bapujinagara Ward No 134

View more details

Start Date
21-01-2017
End Date
21-01-2017
Completed
Filling of Pothholes and Patch Repairs

Filling of Pothholes and Patch Repairs in Ward No: 134

View more details

Start Date
21-01-2017
End Date
21-01-2017
Completed
Maintainence of Park

Maintainence of Nrupathunga BapujiNagar Park

View more details

Start Date
22-01-2017
End Date
22-01-2017
Completed
Asphalting of bad roads

Asphalting to 6th Cross and 5th Cross in Bapujinagar in W N 134

View more details

Start Date
22-01-2017
End Date
22-01-2017
Completed
Re-construction water pipeline

Re-construction water pipeline in Ward in W no 131

View more details

Start Date
12-02-2017
End Date
12-02-2017
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 1st Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
12-02-2017
End Date
12-02-2017
Completed
Providing Borewells at Bapujinagara in ward no 135

Providing Borewells at Bapujinagara in ward no 134 and their maintenance

View more details

Start Date
14-02-2017
End Date
07-06-2017
Completed
Asphalting Of Roads And Improvements Of Drains

Asphalting Of Roads And Improvements Of Drains At New Guddadahalli And Its Cross Roads In W.No 134

View more details

Start Date
19-02-2017
End Date
19-02-2017
Completed
Asphalting Of Roads And Improvements Of Drains

Asphalting Of Roads And Improvements Of Drains At 1St Main Road And Cross Roads Bapujingar Railway Parllel Road In W.No 134

View more details

Start Date
19-02-2017
End Date
19-02-2017
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 6th Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
19-02-2017
End Date
19-02-2017
Completed
Construction of R.C.C. Drain

Construction of R.C.C. Drain from 7th Cross Roads of Shamanna garden in Ward No.134.

View more details

Start Date
19-02-2017
End Date
19-02-2017
Completed
Construction of CC road

Construction of CC road at 4th, 5th and 6th cross roads of Shamanna garden in W-134.

View more details

Start Date
20-03-2017
End Date
20-03-2017
Completed
Installation of New Sign Board

Installation of New Sign Board along with Stickering in the cross and main roads of Ward No:134

View more details

Start Date
20-03-2017
End Date
20-03-2017
Ongoing
SAFETY FIRST

The safety of each and every denizen of Vijayanagara  is our first and foremost priority. To ensure safety for all through round the clock vigilance, we are installing over 600 CCTV
cameras . We are also deploying a people friendly police force to safeguard the interest of the people, and installing trac signals at strategic intersections for ease of movement.

View more details

Start Date
23-03-2017
End Date
24-10-2018
Completed
Drilling of Borewells

Drilling of Borewells 10 nos with pipe line at various places in Shamanna garden and Bapujinagar in W- 134

View more details

Start Date
12-04-2017
End Date
12-04-2017
Completed
Asphalting of bad roads

Asphalting to 3rd Cross and 4th cross in Bapujinagar in W N 134

View more details

Start Date
12-04-2017
End Date
12-04-2017
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 105

View more details

Start Date
12-06-2017
End Date
12-06-2017
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 106

View more details

Start Date
12-06-2017
End Date
12-06-2017
Completed
Economically backward class individual houses

Economically backward class individual houses in W No 111

View more details

Start Date
12-06-2017
End Date
12-06-2017
Completed
Improvements to footpath and drain

Improvements to footpath and drain to 17th B cross road in B.R.I. Colony

View more details

Start Date
29-06-2017
End Date
29-06-2017
Completed
Construction of Nirmala Bangalore Toilet

Construction of Nirmala Bangalore Toilet infront of Bhapujinagara Bus stand in ward no 157

View more details

Start Date
29-06-2017
End Date
29-06-2017